BUB PROGRAMS AND PROJECTS

Refine by

DEFINITION OF TERMS

  • PROPOSED - The project has been proposed under the program but still has to undergo validation by the implementing agency.
  • PIPELINED - The agency has validated the proposed project and preparatory activities are being undertaken, such as preparation of Work and Financial Plans, preparation of documents to be submitted by LGUs and procurements activities (bidding and awarding of project).
  • ONGOING - The implementation of the project has started and there is already a visually verifiable physical accomplishment.
  • COMPLETED - The project has been physically completed.
  • DROPPED - Upon validation by the agency, it has been determined that the project will not be implemented.
  • NO DATA - No report received from the concerned implementing agency.
  • FIND BUB PROJECTS AND PROGRAMS

    Use OpenBUB.gov.ph to explore projects and programs implemented by LGUs across the Philippines.
    Disclaimer: All projects have been categorized in accordance with the 2013 Philippine Standard Geographic Code (PSGC).

    Display:
    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Other Programs/Projects
    13035
    DOLE
    LIVELIHOOD
    ₱543,000
    completed

    PROVISION OF EQUIPMENTS ON VERMI CULTURE AND ORGANIC FERTILIZER PRODUCTION
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱543,000

    Location: ASUNCION (SAUG), DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱543,000
    2016 Q1                    ₱543,000
    2016 Q2                    ₱543,000
    2016 Q3                    ₱543,000
    2016 Q4                    ₱543,000
    2017 Q1                    ₱543,000
    2017 Q2                    ₱543,000
    2017 Q3                    ₱543,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Protective Services
    13036
    DSWD
    SOCIAL WELFARE
    ₱500,000
    completed

    PROVISION OF ECCD LEARNING MATERIALS FOR DCC'S AND SUPERVISED NEIGHBORHOOD PLAY GROUPS
    Date Updated Feb 08, 2018

    • Implementation by: NGA
    • Final Project Amount: ₱500,000

    Location: ASUNCION (SAUG), DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    13037
    DSWD
    COMMUNITY DEVELOPMENT
    ₱500,000
    ongoing

    CONSTRUCTION OF GROUP HAND WASHING FACILITY IN DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND FLORIDE GEL TOOTHPASTE)
    Date Updated Oct 03, 2017

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: ASUNCION (SAUG), DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2016 Q4                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Protective Services
    13038
    DSWD
    SOCIAL WELFARE
    ₱500,000
    completed

    PROVISION OF HYGIENE KIT/MATERIALS IN DAY CARE CENTERS/ SNP SITED
    Date Updated Feb 08, 2018

    • Implementation by: NGA
    • Final Project Amount: ₱500,000

    Location: ASUNCION (SAUG), DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    13039
    DA
    AGRICULTURE & FISHERIES
    ₱1,000,000
    completed

    TILAPIA PRODUCTION
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱1,000,000
    2017 Q1                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000
    2017 Q4                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    REPAIR
    13040
    DepEd
    EDUCATION
    ₱500,000
    completed

    REHABILITATION OF 3-CLASSROOM SCHOOL BUILDING
    Date Updated Jul 02, 2017

    • Implementation by: No data available
    • Final Project Amount: ₱1,100,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱1,100,000
    2017 Q1                    ₱1,100,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    13041
    DILG
    DRM
    ₱1,000,000
    completed

    PROCUREMENT OF RESCUE EQUIPMENT
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱9,000,000
    2015 Q4                    ₱900,000
    2016 Q1                    ₱900,000
    2016 Q2                    ₱900,000
    2016 Q3                    ₱900,000
    2016 Q4                    ₱900,000
    2017 Q1                    ₱900,000
    2017 Q2                    ₱900,000
    2017 Q3                    ₱900,000
    2017 Q4                    ₱900,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    13042
    DILG
    DRM
    ₱1,000,000
    completed

    EXPANSION OF EVACUATION CENTER
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱1,000,000
    2015 Q4                    ₱1,000,000
    2016 Q1                    ₱1,000,000
    2016 Q2                    ₱1,000,000
    2016 Q3                    ₱1,000,000
    2016 Q4                    ₱1,000,000
    2017 Q1                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000
    2017 Q4                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    13043
    DILG
    DRM
    ₱6,000,000
    ongoing

    FLOOD CONTROL PROGRAM (REHABILITATION OF MAG CREEK)
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱6,000,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱4,800,000
    2015 Q4                    ₱4,800,000
    2016 Q1                    ₱4,800,000
    2016 Q2                    ₱4,800,000
    2016 Q3                    ₱4,800,000
    2016 Q4                    ₱4,800,000
    2017 Q1                    ₱4,800,000
    2017 Q2                    ₱4,800,000
    2017 Q3                    ₱4,800,000
    2017 Q4                    ₱4,800,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Other Programs/Projects
    13044
    DOLE
    LIVELIHOOD
    ₱500,000
    completed

    PROCUREMENT OF BARBERING SET, VULCANIZING TOOLS AND SUPPLIES AND EQUIPMENTS FOR CANDLE MAKING
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2016 Q4                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    13045
    DSWD
    COMMUNITY DEVELOPMENT
    ₱500,000
    completed

    REHABILITATION OF 5 DAY CARE CENTER
    Date Updated Oct 03, 2017

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2016 Q4                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Health Facilities Enhancement Program
    13046
    DoH
    HEALTH
    ₱500,000
    ongoing

    PURCHASED OF MEDICINES, SUPPLIES AND INSTRUMENTS
    Date Updated Dec 09, 2016

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Health Facilities Enhancement Program
    13047
    DoH
    HEALTH
    ₱1,500,000
    ongoing

    UPGRADING 3 BARANGAY HEALTH STATION
    Date Updated Dec 09, 2016

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,500,000

    Location: BRAULIO E. DUJALI, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱1,500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    13048
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    ongoing

    INTEGRATED FISHCULTURE, EGG PRODUCTION AND ORGANC FERTILIZER PRODUCTION
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    13049
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    ongoing

    LIVELIHOOD- LUMAD INTEGRATED FARMING (MUSHROOM AND TILAPIA PRODUCTION)
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱500,000
    2016 Q3                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    13050
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    completed

    LIVELIHOOD PROGRAMS/ PROJECTS: CATFISH HATCHERY
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    13051
    DA
    AGRICULTURE & FISHERIES
    ₱1,000,000
    completed

    COLD STORAGE/VAN
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱1,000,000
    2016 Q1                    ₱1,000,000
    2016 Q2                    ₱1,000,000
    2016 Q3                    ₱1,000,000
    2017 Q1                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000
    2017 Q4                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    13052
    DILG
    WATER & SANITATION
    ₱4,000,000
    ongoing

    EXPANSION OF LEVEL II POTABLE WATER SYSTEM
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱4,000,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱3,200,000
    2016 Q1                    ₱3,200,000
    2016 Q2                    ₱3,200,000
    2016 Q3                    ₱3,200,000
    2016 Q4                    ₱3,200,000
    2017 Q1                    ₱3,200,000
    2017 Q2                    ₱3,200,000
    2017 Q3                    ₱3,200,000
    2017 Q4                    ₱3,200,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Sustainable Livelihood Program
    13053
    DSWD
    SOCIAL WELFARE
    ₱500,000
    completed

    DRESSMAKING: LIVELIHOOD FOR WOMEN SECTOR
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Yaman Pinoy
    13054
    DTI
    ECONOMIC DEVELOPMENT
    ₱500,000
    ongoing

    YAMAN PINOY - FISH PROCESSING CENTER FOR LAMAYO
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: CARMEN, DAVAO DEL NORTE, XI

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱500,000
    2016 Q2                    ₱500,000
    2016 Q3                    ₱500,000
    2016 Q4                    ₱500,000
    2017 Q1                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress